[edit] Introduction
A Quinquennial Inspection (QI) is a detailed, professionally-compiled report of a church which must be carried out at least once every five years (Quin = five (Latin)). Its provisions form part of the Inspection of Churches Measure 1955 (as revised 1991) which has the same force as a statute.
The Church of England has pioneered the regular inspection of church buildings with the aim that houses of worship should be kept in good order architecturally, structurally and, generally in an acceptable state of repair. Under the Measure, every diocesan synod must provide for the inspection and subsequent report on the parish churches in the diocese, as well as any other consecrated buildings which are licensed for public worship.
The quinquennial inspector appointed is always a named individual, not a firm, and they should be either an Architects Registration Board (ARB)-registered member or a Royal Institute of Chartered Surveyors (RICS) chartered building surveyor. The inspector is usually appointed by the parochial church council (PCC) – the executive committee of a C of E parish – usually for one inspection and one report. If a parish fails to instigate an inspection, they may be served a notice by the archdeacon to do so which, if ignored, can lead to direct arrangements made by the archdeacon.
The inspector’s training, accreditation and experience in building conservation must be suited to address the complexity and significance of the church in question. Their quinquennial report (QR) will give an overview of the repair needs of the building, and will usually highlight the repairs required according to their priority.
[edit] Typical headings in a quinquennial report
An inspector undertaking a QI may work according to headings which can include:
- Overall condition of the building fabric.
- New repair works carried out since the last inspection.
- Urgent repairs needed and timescale for their completion eg, immediately, ASAP, within 18 months, three years, etc.
- Detailed condition of walls, roof, tower, plumbing, heating, furniture, etc
- Recommendations for future maintenance of building and contents.
- Requirements for further detailed investigations, if needed.
The fees charged for the QI are generally reimbursed by the diocese or deanery, and many churches submit an annual fee towards the report.
[edit] Related articles on Designing Buildings Wiki
IHBC NewsBlog
Notre-Dame Cathedral of Paris reopening: 7-8 December
The reopening is in time for Christmas 2025.
Stirling Prize-winning Salford building to be demolished
The Centenary Building will be bulldozed as part of the wider £2.5bn Crescent regeneration project
Volunteers work to transform 100-year-old ‘hidden’ building into bothy
The building, named Druimnashallag, is located southeast of Oban.
The new ‘Arches for HERs’ Demo site, from the Getty Conservation Institute via HE
It shows how organisations responsible for historic environment records (HER) management can benefit from its powerful features.
ICOMOS-CIF 2024 Symposium celebrates 40th anniversary in Venice
It aims to critically review current practices and theories of conservation of built heritage around the world, and more.
HES establishes new national centre for retrofit of traditional buildings
HES plans to develop the centre follows £1m of funding from UKRI Arts and Humanities Research Council.
High Court rejects oral appeal against tower block decision in historic Bloomsbury
The request was for a full Judicial Review hearing against Camden Council’s approval of a 74m-high tower block in Bloomsbury.
Mayor of London and Government announce bold plans to transform Oxford Street
Plans include turning the road into a traffic-free pedestrianised avenue, creating a beautiful public space.
Crystal Palace Subway, for 160th anniversary
The remarkable Grade II* listed Crystal Palace Subway in South London begins a new era following major restoration.
National Trust brings nature back to an area twice the size of Manchester in less than a decade
The National Trust has achieved its aim of creating or restoring 25,000 hectares of priority habitat on its land by 2025.